Share

The automation and control system allows full management of the Substation with the latest control technologies.

The key word is complete integration among local compartment automation and the mimic panel of the Substation and the remote central control room (OCC). Integration means not only simplification of the wiring but an exchange of complete and rich information for more efficient substation management and effective planning of maintenance.

The integration starts from the local compartment where PLC / RTU are installed for local acquisition and control, connected to a Substation local network that allows data transmission to the station control system. Also, IED devices are interconnected to the system.