Mechan will help to keep trains operating on London’s new Elizabeth Line with its line of specialist maintenance equipment.

The Sheffield-based manufacturer has developed a bespoke set of jacks capable of lifting the complete nine-car electric trains being introduced in the capital, as part of the Crossrail project.

A 36-jack set has been installed at the new Old Oak Common depot in north London, along with five bogie turntables, in a deal that has given Mechan’s order book a £1m boost.

Thanks to the firm’s unique Megalink control system, its flagship jacks can be configured in any number to lift trains without splitting carriages, saving valuable servicing time. The Old Oak Common set is among the largest produced to date, although a record 44 are in use at the Longsight depot in Manchester to maintain 11-car Pendolinos.

Martin Berry, Mechan’s engineering manager, said: “We have worked with Bombardier many times and thanks to our ongoing relationship and the performance of our equipment elsewhere, it was specified by Crossrail from the outset. Keeping passenger services running at full capacity is a huge challenge for the industry, so having the ability to lift a full train is a significant way to save time and make the maintenance process more efficient.”

Mechan’s jacks and turntables are now installed and commissioned at Old Oak Common, ahead of the Elizabeth Line’s launch in December this year. A total of 70 nine-car Bombardier Class 345 electric trains will run on the new commuter service, with the majority being maintained and stabled at the depot.

For more information about Mechan’s jacks or its wide range of lifting and handling equipment, fill out the enquiry form on this page.