Optimising Contact Quality Between Contact Strips and Overhead Line of Oostende’s Tramway
ByFinancial constraints have forced the public transport companies to be more efficient and careful with their resources. As a result, maintenance management systems must be designed to allow for uninterrupted operation of the service and minimum costs.
Deutzer Technische Kohle (DTK) performs track, clearance and third rail measurements, investigations of the distance between platform edge and vehicle entrance of travel comfort and overhead wire as well as pantograph investigations.
Please download this free white paper for more information